Our Services
TURNKEY EPC

Conceptual Stage
- Site Analysis- Roof Strength, Orientation, Type
- Shade Analysis- Determination of Shade Free Area availability
- Study of present and future (projected) electricity consumption (kWh) pattern, study of previous 12 month actual consumption- peak requirement, off-season requirement, average requirement
- Study of Connected Load and Contracted Load with the DISCOM
- Determination of Distribution Transformer Capacity
- Local Govt and/or DISCOM’s regulation/policy on Net Metering
- Meteorological Study of the location for last 50 years: Wind, Rainfall, Wet Days, Solar Irradiance, Solar Path, Temperature (min & max) throughout the year
- Feeding the data in a PVSYST software

Designing
- Equipment Sizing
- Array Layout Drawing
- Structural Drawing
- SLD ( Electrical Single Line Drawing)
- Earthing/Grounding Plan
- Lightning Arrestor

Supply & Testing of Plant Equipment
- Ordering
- Procurement
- Logistics
- Testing at Site

Installation
- Installation of Module Mounting Structures (MMS)
- PCC Blocks
- Base Plate fixation
- Alignment
- Direction & Tilt Angle setting
- Mounting of Solar Panels
- Wiring & Cabling
- Earthing & Grounding: Earth Pits, Conductor fixing, Earthing Strips
- Installation of Lightning Arrestor
- Installation of DCDB, AJB, ACDB, INVERTER, GENERATION METER, CHECK METER
- Testing: Voc, Resistance, etc

Commissioning
- Grid Evacuation
- Net Meter Installation through DISCOM
- Final Testing & Monitoring
- Reporting